Integrated building automation, lighting, energy, networking and security systems for a new corporate headquarters.
A multidisciplinary systems package integrating Siemens Desigo CC, intelligent controls, utility monitoring, network infrastructure and security technology.

01 / PROJECT OVERVIEW
The new corporate headquarters of IDLC Finance PLC at Tejgaon brings together advanced mechanical, electrical, network and security infrastructure. ACE Controls Ltd. is engaged in the building automation and ELV scope, bringing key operational technologies into a coordinated project delivery.
The confirmed scope includes Siemens Desigo CC BMS, HVAC and ventilation controls, lighting controls, floor-wise BTU and electrical energy monitoring, equipment interfaces, Cisco networking and structured cabling, surveillance, access control, turnstiles and parking management.
02 / ACE CONTROLS' SCOPE
The following systems and interfaces are included in ACE Controls' confirmed project scope.
01 · BUILDING AUTOMATION
02 · LIGHTING
03 · ENERGY & UTILITIES
04 · ICT & COMMUNICATIONS
05 · SECURITY & ACCESS
06 · VIDEO STORAGE
03 / ENGINEERING CONTRIBUTION
ACE Controls' scope combines supervisory building controls with the network and ELV infrastructure that supports complex corporate operations. The engineering package includes integration of major HVAC and power-system interfaces alongside lighting, energy monitoring, surveillance, access management and communications.
The CCTV storage system is specified for 24/7 recording with a 365-day footage-retention target. Actual achieved retention depends on installed usable capacity, camera quantity, bitrate, recording policy and acceptance testing; no independent 365-day operational verification is asserted.
SYSTEMS & TECHNOLOGY
Integrated building management, structured connectivity, lighting control and physical-security infrastructure.
04 / PROJECT VALUE
The integrated solution is designed to support the building's operational requirements through: